Caischavedra |
Status |
connected to grid |
Caischavedra |
System Type |
Freestanding |
Caischavedra |
Project Management |
Axpo (NOK)
|
Caischavedra |
Shareholders |
|
Caischavedra |
Investment Costs of Plant |
2.5 Mio. CHF |
Caischavedra |
Subsidy per EnG 71a |
No |
Caischavedra |
Approval of Local Municipality |
Not necessary |
Caischavedra |
Date of Local Municipality Ruling |
00.00.0000 |
Caischavedra |
Status of Planning Application |
Approved |
Caischavedra |
Filing Date of Planning Application |
00.00.0000 |
Caischavedra |
Approval Date of Planning Application |
00.00.0000 |
Caischavedra |
Date of Startup |
01.05.1993 |
Caischavedra |
Objection |
|
Caischavedra |
Website |
|
Caischavedra |
Region |
Lai Alv |
Caischavedra |
ZIP Code |
7180 |
Caischavedra |
Village / Town / City |
Disentis/Muster |
Caischavedra |
Canton |
GR |
Caischavedra |
Latitude |
46.705863 |
Caischavedra |
Longitude |
8.813537 |
Caischavedra |
Altitude |
1903 m.a.s.l. |
Caischavedra |
Ground Area Plant |
0.1 ha |
Caischavedra |
Nominal AC Power of Plant |
MVA |
Caischavedra |
Nominal DC Power of Plant |
0.1 MW |
Caischavedra |
Annual Yield |
0.12 GWh |
Caischavedra |
Specific Annual Yield |
1200 kWh/kWp |
Caischavedra |
Winter Yield |
GWh |
Caischavedra |
Specific Winter Yield |
kWh/kWp |
Caischavedra |
Winter Percentage |
0% |
Caischavedra |
Max. Voltage |
V |
Caischavedra |
Number of Transformer Stations |
|
Caischavedra |
Number of Inverters |
|
Caischavedra |
Number of MPPT |
|
Caischavedra |
Bifacial |
No |
Caischavedra |
Module Manufacturer |
|
Caischavedra |
Module Type |
|
Caischavedra |
Module Glass Thickness |
mm |
Caischavedra |
Cell Type |
|
Caischavedra |
Cell Size |
|
Caischavedra |
Max. Static Module Load Front |
Pa |
Caischavedra |
Max. Static Module Load Back |
Pa |
Caischavedra |
Number of Modules |
368 |
Caischavedra |
Number of Solar Tables |
|
Caischavedra |
Number of Modules per Solar Table |
|
Caischavedra |
Surface Area of Modules |
770 m2 |
Caischavedra |
Installation Type |
|
Caischavedra |
Angle of Inclination |
60 ° |
Caischavedra |
Orientation |
-24 ° |
Caischavedra |
Row Spacing (avg.) |
m |
Caischavedra |
Ground Clearance (avg.) |
3 m |
Caischavedra |
Foundation |
|
Caischavedra |
Covered Ground Area Substructure |
m2 |
Caischavedra |
Number of Explosive Anchors |
|
Caischavedra |
DC Cable Quantity |
km |
Caischavedra |
Steel Quantity |
kg |
Date of Data Verification with Project Management: 23.04.2024