PVA Hohsaas |
Status |
in planning |
PVA Hohsaas |
System Type |
|
PVA Hohsaas |
Project Management |
|
PVA Hohsaas |
Shareholders |
|
PVA Hohsaas |
Investment Costs of Plant |
60 Mio. CHF |
PVA Hohsaas |
Subsidy per EnG 71a |
Yes |
PVA Hohsaas |
Approval of Local Municipality |
Pending |
PVA Hohsaas |
Date of Local Municipality Ruling |
00.00.0000 |
PVA Hohsaas |
Status of Planning Application |
Not Submitted |
PVA Hohsaas |
Filing Date of Planning Application |
00.00.0000 |
PVA Hohsaas |
Approval Date of Planning Application |
00.00.0000 |
PVA Hohsaas |
Date of Startup |
00.00.0000 |
PVA Hohsaas |
Objection |
|
PVA Hohsaas |
Website |
|
PVA Hohsaas |
Region |
Kreuzboden-Hohsaas |
PVA Hohsaas |
ZIP Code |
3910 |
PVA Hohsaas |
Village / Town / City |
Saas-Grund |
PVA Hohsaas |
Canton |
VS |
PVA Hohsaas |
Latitude |
46.13979 |
PVA Hohsaas |
Longitude |
7.98878 |
PVA Hohsaas |
Altitude |
3100 m.a.s.l. |
PVA Hohsaas |
Ground Area Plant |
6.5 ha |
PVA Hohsaas |
Nominal AC Power of Plant |
MVA |
PVA Hohsaas |
Nominal DC Power of Plant |
7 MW |
PVA Hohsaas |
Annual Yield |
12 GWh |
PVA Hohsaas |
Specific Annual Yield |
1571 kWh/kWp |
PVA Hohsaas |
Winter Yield |
4.73 GWh |
PVA Hohsaas |
Specific Winter Yield |
676 kWh/kWp |
PVA Hohsaas |
Winter Percentage |
43% |
PVA Hohsaas |
Max. Voltage |
V |
PVA Hohsaas |
Number of Transformer Stations |
|
PVA Hohsaas |
Number of Inverters |
|
PVA Hohsaas |
Number of MPPT |
|
PVA Hohsaas |
Bifacial |
|
PVA Hohsaas |
Module Manufacturer |
|
PVA Hohsaas |
Module Type |
|
PVA Hohsaas |
Module Glass Thickness |
mm |
PVA Hohsaas |
Cell Type |
|
PVA Hohsaas |
Cell Size |
|
PVA Hohsaas |
Max. Static Module Load Front |
Pa |
PVA Hohsaas |
Max. Static Module Load Back |
Pa |
PVA Hohsaas |
Number of Modules |
25000 |
PVA Hohsaas |
Number of Solar Tables |
|
PVA Hohsaas |
Number of Modules per Solar Table |
|
PVA Hohsaas |
Surface Area of Modules |
m2 |
PVA Hohsaas |
Installation Type |
|
PVA Hohsaas |
Angle of Inclination |
° |
PVA Hohsaas |
Orientation |
0 ° |
PVA Hohsaas |
Row Spacing (avg.) |
m |
PVA Hohsaas |
Ground Clearance (avg.) |
m |
PVA Hohsaas |
Foundation |
|
PVA Hohsaas |
Covered Ground Area Substructure |
m2 |
PVA Hohsaas |
Number of Explosive Anchors |
|
PVA Hohsaas |
DC Cable Quantity |
km |
PVA Hohsaas |
Steel Quantity |
kg |
Data Verification with Project Management pending