Splügen-Tambo |
Status |
deferred |
Splügen-Tambo |
System Type |
Freestanding |
Splügen-Tambo |
Project Management |
EWZ |
Splügen-Tambo |
Shareholders |
|
Splügen-Tambo |
Investment Costs of Plant |
Mio. CHF |
Splügen-Tambo |
Subsidy per EnG 71a |
Yes |
Splügen-Tambo |
Approval of Local Municipality |
Unattained |
Splügen-Tambo |
Date of Local Municipality Ruling |
00.00.0000 |
Splügen-Tambo |
Status of Planning Application |
Not Submitted |
Splügen-Tambo |
Filing Date of Planning Application |
00.00.0000 |
Splügen-Tambo |
Approval Date of Planning Application |
00.00.0000 |
Splügen-Tambo |
Date of Startup |
00.00.0000 |
Splügen-Tambo |
Objection |
|
Splügen-Tambo |
Website |
|
Splügen-Tambo |
Region |
Tanatzhöhi |
Splügen-Tambo |
ZIP Code |
7435 |
Splügen-Tambo |
Village / Town / City |
Splügen |
Splügen-Tambo |
Canton |
GR |
Splügen-Tambo |
Latitude |
46.53071 |
Splügen-Tambo |
Longitude |
9.31370 |
Splügen-Tambo |
Altitude |
m.a.s.l. |
Splügen-Tambo |
Ground Area Plant |
ha |
Splügen-Tambo |
Nominal AC Power of Plant |
MVA |
Splügen-Tambo |
Nominal DC Power of Plant |
0 MW |
Splügen-Tambo |
Annual Yield |
13 GWh |
Splügen-Tambo |
Specific Annual Yield |
0 kWh/kWp |
Splügen-Tambo |
Winter Yield |
GWh |
Splügen-Tambo |
Specific Winter Yield |
kWh/kWp |
Splügen-Tambo |
Winter Percentage |
0% |
Splügen-Tambo |
Max. Voltage |
V |
Splügen-Tambo |
Number of Transformer Stations |
|
Splügen-Tambo |
Number of Inverters |
|
Splügen-Tambo |
Number of MPPT |
|
Splügen-Tambo |
Bifacial |
|
Splügen-Tambo |
Module Manufacturer |
|
Splügen-Tambo |
Module Type |
|
Splügen-Tambo |
Module Glass Thickness |
mm |
Splügen-Tambo |
Cell Type |
|
Splügen-Tambo |
Cell Size |
|
Splügen-Tambo |
Max. Static Module Load Front |
Pa |
Splügen-Tambo |
Max. Static Module Load Back |
Pa |
Splügen-Tambo |
Number of Modules |
|
Splügen-Tambo |
Number of Solar Tables |
|
Splügen-Tambo |
Number of Modules per Solar Table |
|
Splügen-Tambo |
Surface Area of Modules |
m2 |
Splügen-Tambo |
Installation Type |
|
Splügen-Tambo |
Angle of Inclination |
° |
Splügen-Tambo |
Orientation |
° |
Splügen-Tambo |
Row Spacing (avg.) |
m |
Splügen-Tambo |
Ground Clearance (avg.) |
m |
Splügen-Tambo |
Foundation |
|
Splügen-Tambo |
Covered Ground Area Substructure |
m2 |
Splügen-Tambo |
Number of Explosive Anchors |
|
Splügen-Tambo |
DC Cable Quantity |
km |
Splügen-Tambo |
Steel Quantity |
kg |
Data Verification with Project Management pending